Saturday, 5 May 2012

Final Posting


Our experienced in this Multimedia project Management begins with our first documentation that is group profile. We have to present our slide about this group profile such as we introduced our group members and our position. After finished group profile documentation, we had to make the proposal documentation including the cover letter template, documentation, gantt chart and costing for our product that we want to create.
Before we started our website, we must create at least five designs for our website. Then, one of the website will be choose by our lecturer, Sir Azril b Othman. Every week, all groups must show the progress about the website or cd package that we had made. As usual in the first week, our website that we had designed had been rejected by our lecturer. Our design had been rejected by our lecturer because our design not impressive but our group not easily give up and try to make the better than before.
Then, all groups must make a project specification. In this project specification, we had to make the cover letter template, the documentation, our storyboard and the style guide. In this task we must draw our storyboard in every page. We also must prepare our style guide about the button, what software that we had been used and many more. Lastly, in final documentation, we should prepare our slide to present about the testing control sheet, risk management sheet, storyboard and visual design.
Besides, this internship program makes us realized the value of working together as a team and as a new experience in working environment, which challenges us every minute. This was the experienced that we can’t forget when doing this project.

Thursday, 3 May 2012

tamat


Alhamdulillah...tamat suda MPM.
Thank to all group member silent studio.
Thank your commitment on your work.
To lecturer Sir Azril thank you very much give our group more knowledge,
experience and anything else about Multimedia Project Management.
Hope group Silent studio success in Multimedia Project (MP) on next semester (5).
thank you.

Tuesday, 1 May 2012

Monday, 16 April 2012

WEEK 13

1. update product
2. doing Risk Management Sheet and testing control Sheet

Sunday, 1 April 2012

website




Minute Meeting


Progress Web site

Date : 2/4/2012
Time : 1.30pm - 4.30.pm
Venue : McD
Present : 1. Mohd Shahril bin Nordin
              2. Raja Nur Ashikin bt Raja Radzman
              3. Muhammad Azwan b Amran
              4. Nur 'Amirah bt Abu Hanifah


Meeting Agenda :

1.Create Web Site.

Wednesday, 29 February 2012

Wednesday, 22 February 2012

Minute Meeting


Q & A...


Minute Meeting
Date : 23/2/2012
Time : 10.30am - 11.30am
Venue : library block A
Present : 1. Mohd Shahril bin Nordin
              2. Raja Nur Ashikin bt Raja Radzman
              3. Muhammad Azwan b Amran
              4. Nur 'Amirah bt Abu Hanifah


Meeting Agenda :

1.Update blog for the Question and Answer.
2. The meeting was Adjourned at 01/03/2012.

MPM Q&A


1. What is Standard browser in Malaysia?
    Internet Explore

2. What is the standard web resolution?
                980 – 1000 = width
                768 – high  = length
  
          3.What is the standard CD resolution?
               800 x 600

          4.What is the new technology that will replace flash video?
               HTML file

          5.What is the main reason we choose director instead of flash for flash for CD package?
Director
Flash

Raster  - (picture)
Vector – ( object line)

          6.Where are the best position for button for website?
             Left side

          7.Where are the best position for button for CD package?
             Anywhere or up to designer

          8.Differentiate between icon, button and text?
             Button is the best because button have icon and text. Many user friendly about the button.

          9.What is montage?
             Montage a simple animation or intro before CD package and web site starter.

         10.Differentiate between CD and DVD.
CD
DVD
Capacity – 700MB
Capacity - 8GB

         11.What is Domain and what is Hosting?
Domain
Hosting
www.domain.com.my (address for web site)
Location for the storage of web page and file.

         12.Which of following has the biggest effect on PC or computer performance.
              Hard Disk.

Sunday, 19 February 2012

Searching Concept and Inspire of Website

Assalamualaikum 

Concept Store







Inspiration Concept










Meeting

Preparing to group proposal...


Minute Meeting
Date : 19/2/2012
Time : 5.00pm - 6.30
Venue : Mc'd Jaya Jusco
Present : 1. Mohd Shahril bin Nordin
              2. Raja Nur Ashikin bt Raja Radzman
              3. Muhammad Azwan b Amran
              4. Nur 'Amirah bt Abu Hanifah


Meeting Agenda :

1. Preparation slide proposal project II
2. The meeting was Adjourned at 23/02/2012.

Wednesday, 15 February 2012

Meeting Group

Meeting Minute

Date     : 16/02/2012
Time     : 11.00 am- 1.00pm 
Venue   : Library Block A
Present : 1. Mohd Shahril b Nordin
              2. Raja Nur Ashikin bt Raja Radzman
              3. Muhammad Azwan b Amran
              4. Nur 'Amirah bt Abu Hanifah

Meeting Agenda :

1. Preparation slide proposal project.
2. Conformation company Amijaa Enterprise.
3. The meeting was Adjourned at 23/02/2012.

Tuesday, 14 February 2012

Meeting of Project Proposal Presentation

Date  : 14/2/2012
Location   : library block B
Attendance : all member group present....;-)

Monday, 13 February 2012

Group Silent Studio

All Group Name
MOHD SHAHRIL B NORDIN -  PTM100702117 
Project Manager, Evaluator
RAJA NUR ASHIKIN BT RAJA RADZMAN - PTM10070219
Assistant Project Manager
MUHAMMAD AZWAN BIN AMRAN - PTM 10070203
Graphic Designer, AV Specialist
NUR ‘ AMIRAH BT ABU HANIFAH -  PTM100702084
Multimedia Programmer